Power-Plant building

Montage Kohlestaubsilos

Assembly of carbon dust silos in the power plant "Schwarze Pumpe" 2006

Montage Kohlestaubsilos im Kraftwerk/Installation of coal dust silos in a powerplant
 

Assembly of two carbon dust silos

Client:                                  AJO - tec GmbH
Construction site:             Power plant "Schwarze Pumpe"
Period of assembly:         April until August 2006


The silos with an aperture of 8,00m and a height of 21,00m were pre-assembled out of segments at the construction site.       
The lifting of the 50,0 to. heavy silos was carried out via a 300 to. truck-mounted crane.       
The welding was predominantly executed by the rod welding process.      